FPC ERP CRM HRMS Systems

Topicsالموضوعات

Item consumption links

Summary

Link the item you sell to materials deducted from stock when the sales invoice is saved, or when the session is recorded. One level. This is not a manufacturing bill of materials.

When to use it

Before you sell a service that pulls materials, or a kit that unpacks into components. Use Manufacturing for factory production. Stay on the branch whose stock will be deducted.

Steps

  1. Product Management (ادارة المنتجات) → Item consumption links (ربط استهلاك الأصناف). The sold-item list (الصنف المباع) and the consumed-item list (الصنف المستهلك) are sorted by name and show only items that are not deleted. Both items and the quantity per sold unit (الكمية لكل وحدة مباعة) are required. The unit (الوحدة) is not. Notes are not a column in the list.
  2. Do not link an item to itself. One level only. Changing the link does not rewrite sessions or invoices already saved.
  3. Products (السلع) → open the sold item. Deduct stock (خصم المخزون) is On sale (عند البيع) or On consume (عند الاستهلاك). Count this item in stock (حساب مخزون هذا الصنف) chooses whether the sold item itself is counted. A service usually leaves that off so only the materials move.
  4. On sale: saving Add Sales Invoice (اضافة فاتورة بيع) deducts the materials, and the consumption window in CRM and in the clinic becomes view-only.
  5. On consume: the sale does not deduct the materials. The session screen deducts up to the quantity per unit times the quantity sold.
  6. Clear (مسح) resets both lists and clears the quantity and the notes. It does not delete a saved link. The delete column shows on the list and while editing, and not while adding.
  7. Check: sell one unit of جلسة وجه. If deduct is on sale, قطعة قطن drops by the linked quantity. If the material is short, confirm only when the physical count matches; otherwise cancel the whole invoice.

Common mistakes

  • Do not mix this link with a manufacturing order or with a transfer between warehouses.
  • A shortage warning is not a way to ignore the count. Cancel the invoice if the material is not there.
  • Clear does not delete a saved link.

Notes

  • Success: one sale or one session moves the component by the linked quantity, and a later edit of the link does not change what was already saved.
  • Example: جلسة وجه is linked to two قطعة قطن. After one sales invoice for one session, cotton drops by two when deduct is on sale.
  • Recording the daily session is explained in Using a session package.

Screens

  • Item consumption links
  • Products
  • Add Sales Invoice
  • Deduct stock
  • Sold item
  • Consumed item
On this pageفي هذه الصفحة