FPC ERP CRM HRMS Systems

Topicsالموضوعات

Transfers and issues

Summary

Move a quantity between two branches, issue it to an employee, record a deficit, or record damaged goods. Saving is what changes View Inventory. Close on the row blocks deletion. It does not move the quantity.

When to use it

When goods leave a branch for another branch, for custody, or to be written off. Deficit and damaged goods are not a sale. A supplier receipt is a purchase invoice.

Steps

  1. Transfers → Add Transfer (اضافة تحويل). من (From) and الي (To) are branches you are allowed to manage. Choose السلعة (Item) and الكمية (Quantity). الرصيد الحالي (On-hand) is the source branch. Then press اضافة (Add).
  2. Add Permission Voucher (اضافة اذن صرف): الي is an employee, not a branch. Add Deficit (اضافة عجز) and Add Damaged (اضافة هالك) do not show a destination. Each one is its own menu row.
  3. After saving, print Print Transfer Statement (طباعة بيان تحويلات) to travel with the goods. Today’s row is on the add screen. For a period, open View Transfers and choose the dates. With no period the screen says برجاء اختيار الفترة.
  4. On the row, اغلاق (Close) turns it green and hides حذف (Delete). The quantity already moved when you pressed Add.
  5. Contract Dispensing (صرف للعقود) lists issues tied to a contract. Convert Raw Materials to Products (تحويل المواد الخام إلى منتجات) is another screen. It is not a manufacturing order.
  6. Success: View Inventory is lower by that quantity at the source and higher at the destination, and the row is on View Transfers for that period.

Common mistakes

  • If the goods arrived and the quantity did not change, do not create a second transfer. Check the branch on View Inventory and that the row was not deleted.
  • Do not record damaged goods in place of a deficit. Damaged goods cannot be sold. A deficit is a missing quantity.
  • A branch missing from From or To is not one of the branches you manage on this screen.

Notes

  • Example: 10 bags from Palm Branch to Harbour Branch. After Add, Palm is 10 lower and Harbour is 10 higher. Then Close so the row cannot be deleted.
  • The confirmation step is in Receive a stock transfer. A manufacturing order is under Manufacturing.

Screens

  • Add Transfer
  • Add Permission Voucher
  • Add Deficit
  • Add Damaged
  • Print Transfer Statement
  • View Transfers
  • View Deficits
  • View Damaged
  • Contract Dispensing
  • Convert Raw Materials to Products
On this pageفي هذه الصفحة